Untitled Document

BPM Blog

BPM made simpler

In addition to creating dashboards the general progress of a project, it is also possible to create a dashboard for the analysis of an existing process. The first steps will include:

  1. The number of tasks and their specific path in the process and
  2. The time taken for each task and
  3. Elapsed time between each task

Analysis through time thresholds

 

The above process shows where tasks have been flagged where the take more than 3 minutes and then presented with a time threshold visual graphic. The result a simple dashboard of the process showing where analysis should be taken place for tasks and wait time between tasks.

 

Leave a Reply