TaskMap 4.0.5 Revision History
- After warning that the user should save the drawing before creating a Page/Task link, TaskMap no longer displays the hyperlink dialog anyway
- The Task dropdown in the hyperlink dialog now shows the correct value when editing an existing Page/Task link
- Spell check no longer inserts a space at the front of the Task Description each time it corrects a spelling error in a Guideline or Resource; similarly, spaces are no longer inserted at the front of a Task Link description when Task Link errors are corrected
- Applying a fill color to a Task no longer applies the color to Guideline, Resource, Supporting Role and Hyperlink icons under that Task
- A user-entered description for an email hyperlink is now recorded properly; also the tab sequence in the email hyperlink form is now correct
View all updates for version 4.0.5
TaskMap 4 Installation Guide
TaskMap 4 Installation Guide |